Lenta Trade Center, Russia
The power plant based on original MWM containers with TCG 2016 V16 gas engines and heat recovery system is designed to provide electricity and heat to the shopping and entertainment center.
The power plant based on original MWM containers with TCG 2016 V16 gas engines and heat recovery system is designed to provide electricity and heat to the shopping and entertainment center.
The trigeneration power plant with five TCG 2020 V20 gas engines provides electricity and heat to the shopping and entertainment center in Saratov, Russia.
The 4.5 MW Container CHP Plant with TCG 2020 V16 gas engines provides electricity and heat to a warehouse complex in Moscow, Russia.