AtakayCement, Russia
Since 2014, six containerized MWM TCG 2020 V16 K gensets provide 9 MW of flexible, reliable power to meet the energy demands of AtakayCement in the Krasnodar Area, Russia.
Since 2014, six containerized MWM TCG 2020 V16 K gensets provide 9 MW of flexible, reliable power to meet the energy demands of AtakayCement in the Krasnodar Area, Russia.
A CHP plant based on two MWM gas engines and two boilers provide hot water to 3,105 apartments in 50 multistory blocks, two schools, three kindergartens, and two hospitals for heating and usage purposes in one of Tashkent districts.
Thanks to the new plant, power fluctuations are no longer an obstacle to the textile production processes. The hot water produced during the production process is used to heat a 9-hectare greenhouse.
A CHP plant based on three MWM gas engines was put into operation for a greenhouse complex for champignon cultivation in Voronezh region.
The 2.3 MW cogeneration project for a textile enterprise was commissioned in 2022 with a waste heat recovery steam boiler.