PGNiG TERMIKA Energetyka przemysłowa S.A., Poland

PGNiG TERMIKA Energetyka przemysłowa S.A., Poland

The CHP plant of the energy company PGNiG TERMIKA Energetyka Przemysłowa S.A. next to the “Pniów” coal mine in Poland, which is being modernized with two TCG 2032 V16 gas engines, in the future will produce heat and power from methane.

NLMK Ural, Nizhnie Sergi, Russia

NLMK Ural, Nizhnie Sergi, Russia

The system is based on an MWM TCG 2032B V16 gas engine with an electrical output of 4.5 MW and meets the entire heat demand of the company.

NICEVT, Moscow, Russia

NICEVT, Moscow, Russia

The cogeneration power plant with MWM TCG 2032 V16 gas engines produces reliably energy and heat for the manufacturing of complex electronic equipment at NICEVT in Moscow, Russia.

Logistics Center, Perm, Russia

Logistics Center, Perm, Russia

The power plant for the Logistics Centre of Tander JSC in Perm, Russia is designed to provide electric and thermal power to the storage facility. The main generating equipment is a MWM gas genset TCG 2020 V12.

Logistics Center, Penza, Russia

Logistics Center, Penza, Russia

The container power plant with a MWM TCG 2020 V16K gas engine provides an uninterrupted all-year-round power supply for the logistics center in Penza, Russia, and is operated in island mode in parallel with other gensets.